The Site
In considering the site, three concerns need to be addressed. These include
the physical dimensions of the overall halfpipe site (including above ground
or permanent foundation pipes), the slope of the land, and public access
including the technical issues of lifts and electricity.
The first thought of building a pipe needs to center on the decision of the
halfpipe being above ground or shaped as a permanent foundation in the ground.
Here is a breakdown on the advantages and disadvantages of both systems:
|
Above Ground Halfpipe
Medium level of thought and planning
Medium level of cost to build and maintain
Easy to move if site needs change
Every year you start over
Takes substantial amount of snow to construct
Orientation to sun is a medium factor
Spectator viewing adequate at best
Maintenance less difficult
|
Permanent Foundation Pipe
High level of planning
High level of initial cost
Not easy to move
Consistent base to start
Saves on amount of snow needed
Orientation to sun a high factor
Spectator viewing is enhanced
Maintenance more difficult
|
The permanent foundation pipe's main attractions are the consistent base
in which to build the halfpipe and the fact that it takes less snow to construct.
The maintenance issues, however, are extremely high and variable. This means
the level of commitment and cost precludes many areas from building permanent
foundations. As it stands, the best pipes are built above ground because
they allow for the continued maintenance without hitting dirt or grass that
is found in permanent structures.
The physical site for an above ground halfpipe needs to be at least 60 meters
wide and 150 meters long. This will guarantee enough room for the halfpipe
channel, 10 meters of roll-out deck on each wall and a start and finish area.
I also guarantees that the snowcats have enough turning radius to move snow
around when building the pipe.
The slope of the halfpipe is very important. The perfect pitch for a halfpipe
is 18(deg) and should be measured with an inclinometer for verification.
This pitch needs to be kept throughout the construction of the halfpipe and
the final product (the inner slope of the channel) should be consistent from
top to bottom.
Public access, including the technical issues of lifts and electricity, are
very important for the overall use of the pipe. The pipe should not be placed
away from the public. Rather, it should be close to facilities like ski lifts
for access, built at the base of the area for easy transportation and viewing
and close to facilities for material moving, electrical connections for music,
and competition results. The halfpipe should be a showcase venue and should
have access for all riders to enjoy.